Customer request:

Needed: weather protection for oversized slab-mounted pump and valve equipment (Amoco tank farm).
Solution: 24' x 24' all-steel (nonconbustible), multi-section, Specialty Structure installation.

10:30 a.m. Anchor points are bolted; pump equipment is connected into pre-wired distribution panel.
Note drop ceiling, florescent lighting, and wall outlets pre-installed.